Corrections | Autumn 2014

PDF
Print
E-mail
Written by Administrator
Tuesday, 26 August 2014 16:32

Pattern #1 Hooded Cabled Scarf

Photo on page 51, instructions begin on page 82.
Updated: 30Oct2014

Correction is underlined.

Last line before Beg chart 3:
Rep last 6 rows once more—66 sts.

 

Pattern #5 Long Cabled Coat

Photo on page 56, instructions begin on page 87.
Updated: 23Sept2014

Corrections are is underlined.

1. In Charts 1 and 4, Row 13 does not have a purl stitch after the decrease.
Row 13 (RS) K2, ssk, k3.

2. A revised chart has been posted. [PDF 24KB]

 

Pattern #6 Cabled Shell with Arm Warmers

Photo on page 57, instructions begin on page 88.
Updated: 22Dec2014

Corrections are underlined.

BACK
After rib and inc row, before Beg Charts, change to larger needles.

 

Pattern #7 Funnel-Neck Pullover

Photo on page 56, instructions begin on page 89.
Updated: 21Sept2014

A revised chart #7 has been posted. [PDF 60KB]

Row 57: Move 4-st LC 2 sts to right & 4-st RC 2 sts to left

 

Pattern #8 Fretwork Pullover

Photo on page 59, instructions begin on page 92.
Updated: 01Oct2014

Corrections are underlined.

Back Center Panel
1st Cord Setup
Row 1 (WS)
[P2, k2] 2 (3, 3, 3) times, p3, turn.
Work rows 2–5 as for right panel, then cont as written.

Remainder of Cable Panel

Row 3 K6 (10, 10, 10), p2, k3, turn.

 

 

Pattern #12 Slouchy Beanie

Photo on page 64, instructions begin on page 99.
Updated: 6May2015

Yarn weight in ball symbol should be 4.

S2PP Sl 2 sts through the back loop, p1, pass slip stitches over p1.

 

 

Pattern #23 Raglan Pullover

Photo on page 78, instructions begin on page 107.
Updated: 17Nov2014

Corrections are underlined.

Stitch Glossary
Make bobble
K in to the (front, back, front, back front) of next st—5 sts on RH needle. [Pass 2nd st on RH needle over first st] 4 times.

Last Updated ( Wednesday, 06 May 2015 19:50 )